Author: Roy Sloane

Feature Story

Op Ed: The real way to fix the BQE — Build the Cross Downtown Brooklyn Tunnel

Fixing the TCR does NOT fix the BQE. Mayor Mamdani’s plan to restore and repair the existing Triple Cantilevered Roadway (TCR) on its current footprint with two lanes in each direction is an important, necessary step on the long road toward a comprehensive re-visioning of the Brooklyn Queens Expressway (BQE). But make no mistake— fixing the TCR does NOT fix […]